PROJECT INDEX / 2026

Decision problems,
made explicit.

Case studies go beyond the final metric. Every repository links to working code, assumptions, and the trade-offs behind the result.

REPOSITORIES09
DOMAINS05
PRIMARY STACKPY

DATA SYNCED / BUILD TIME

All projects 09

PROJECT / 01
ML + OptimizationCase study

Predictive Maintenance: RUL + Scheduling

RUL prediction connected to capacity-constrained maintenance scheduling, with uncertainty and negative findings reported explicitly.

PROJECT / 02
RoutingCase study

ALNS for Pickup & Delivery

Adaptive destroy and repair operators for pickup-and-delivery routing with time windows, capacity, and precedence constraints.

PROJECT / 03
Facility Location

Charging Facility Location & Routing

A multi-part optimization study spanning robust routing, charging infrastructure, fairness, coalition costs, and decentralized behavior.

PROJECT / 04
Routing

TSP and VRPTW Optimization

Exact routing formulations under capacity, time windows, vehicle penalties, and driver working-time constraints.

PROJECT / 05
Facility Location

UFL Lagrangian Heuristic

Lower and upper bounds for uncapacitated facility location using Lagrangian relaxation and subgradient optimization.

PROJECT / 06
Routing

TSP Optimization Heuristics

Constructive heuristics, GRASP, 2-opt, and iterated local search compared on Euclidean TSPLIB instances.

PROJECT / 07
Simulation & Queueing

Hospital Outpatient Simulation

A discrete-event model of appointments, walk-ins, doctors, X-ray rooms, priorities, queues, and time-dependent service.

PROJECT / 08
Simulation & Queueing

Queueing Models Calculator

An interactive desktop calculator for five M/M/* queueing systems and their operational performance measures.

PROJECT / 09
Assignment

Generalized Assignment — TA

A capacity-aware Threshold Accepting metaheuristic evaluated against a Gurobi LP-relaxation lower bound.

OPEN TO GOOD PROBLEMS

Have a data or decision problem?
Let’s model it.